Solar Panels Permit Requirements In Los Angeles
If you’re researching solar panels permit requirements in Los Angeles, you’re doing the smart part—planning before anyone touches your roof. This page breaks down permits, timeline expectations, inspections, and the homeowner decisions that keep projects moving.
TL;DR: Most residential solar in Los Angeles runs through LADBS for permitting and inspections. Your timeline depends on how complete the plan set is and whether you add scope like roofing or an electrical panel upgrade. Use the checklist below to reduce re-submittals.
Quick Checklist (Bring This To Your Estimate Call):
- Confirm roof condition and any planned reroofing.
- Know your main electrical panel size and breaker space.
- Decide where conduit can run (attic, exterior wall, garage).
- Gather recent utility bills and clear roof photos.
- Ask for a permit-ready plan set (site plan, roof layout, single-line diagram).
- Plan for inspection access and a day-of shutdown window.
Want a permit-first game plan? Schedule a free estimate online, or call +1 (916) 234-6696.
Step-By-Step Timeline + Checklist For Solar Panels Permit Requirements
| Decision | Why it matters | Quick check |
|---|---|---|
| Roof condition | Installing over an aging roof risks rework later. | Inspect first and plan reroof timing if needed. |
| System size | Determines cost and energy offset. | Size from real kWh usage and shading. |
| Inverter type | Affects monitoring and shade performance. | Compare microinverters vs string + optimizers. |
| Permits & interconnection | Approvals can drive the schedule. | Ask who handles permits/utility and expected timelines. |
Permits aren’t just paperwork. For example, They drive what gets built, how it’s inspected, and when you can turn the system on. Additionally, When you map solar panels permit requirements early, you avoid surprise redesigns once the city reviews the plans.
This checklist helps if you’re comparing installers, planning roof work, or trying to understand what LADBS will ask for. In addition, It’s written for homeowners who want clear expectations before signing.
US Construction & Remodeling Corp. For this reason, supports Los Angeles homeowners with solar planning, installation, and permit coordination. For example, We focus on aligning the plan set to the field install so inspections go smoother.
Permit Notes For Los Angeles Homeowners
In Los Angeles, rooftop solar permits generally go through the Los Angeles Department of Building and Safety (LADBS). Overall, Many projects include a building permit for roof mounting and an electrical permit for wiring and equipment. As a result, LADBS provides online services for permitting and plan review, and some residential scopes may qualify for faster online options depending on the project details.
Permit requirements vary by property and design. Additionally, Your installer should confirm what applies to your address, then coordinate inspection scheduling so work pauses as little as possible. Additionally, Separately, your utility typically has its own approval step before it grants permission to operate.
Common Mistakes That Slow Approvals
- Roof layouts that don’t show attachment details, also flashing approach, or structural assumptions.
- Missing or mismatched equipment spec sheets (panels, racking, inverter, disconnects).
- Ignoring an older main panel with limited breaker space or clearance issues.
- Starting installation before the permit is issued, which can trigger stop-work corrections.
- Routing conduit on the fly, then discovering it conflicts with access or aesthetics.
- Installing on a roof near end-of-life, then having to remove and reinstall later.
Who This Checklist Is For
- Homeowners planning a new rooftop solar system.
- Homeowners adding battery storage or an EV-ready electrical upgrade.
- Anyone coordinating solar with a reroof or roof repair.
- Buyers reviewing permit status on an existing solar system.

Pre-Work Checklist (Design, Materials, Access) For Solar Panels Permit Requirements
Most delays happen before anyone orders materials. As a result, Treat solar panels permit requirements as part of the design package, not a last-minute form set. In addition, A permit-ready plan set answers structural and electrical questions up front, so plan check has fewer reasons to request revisions.
Design Details To Confirm Before Submittal
- Panel layout: number of modules, roof planes used, and clear pathways where needed.
- Mounting method: attachment type, flashing, and how you’ll protect the roof surface.
- Equipment locations: inverter and disconnect placement, plus where conduit will run.
- Electrical tie-in: panel rating, breaker sizing, grounding/bonding, and required labeling.
- Future add-ons: battery storage, EV charging, or a service upgrade can change drawings and inspections.
Materials And Access Prep (Homeowner Checklist)
- Clear attic/garage access for measurements and routing.
- Note roof material (tile, shingle, flat) and any known leaks or soft spots.
- Identify where crews can park and stage materials without blocking daily access.
- Keep the main electrical panel and meter area accessible and unobstructed.
Timeline Snapshot
Every home is different, but the phase order stays similar. Also, When you bundle related work up front, you often avoid mid-project redesigns and rescheduling.
| Phase | What you’ll see | Typical duration* |
|---|---|---|
| Site review + plan set | Measurements, photos, drawings, equipment selections | 3–10 days |
| LADBS review + permit | Online submittal, corrections if needed, permit issuance | 2–6+ weeks |
| Installation | Roof mounts, wiring, equipment install, labeling | 1–3 days |
| City inspection | Inspection scheduling and sign-off | 3–14 days |
| Utility approval | Interconnection review and permission to operate | 1–4+ weeks |
*Ranges vary by scope, plan corrections, and scheduling availability.
Build Phase Checklist (Daily/Weekly)
Once the permit is issued and materials arrive, your goal is simple: keep the site safe, protect the roof, and document changes. Meanwhile, A few quick checks prevent small issues from becoming inspection-day surprises.
Daily Checks During Installation
- Confirm crews protect landscaping and keep walkways clear.
- Ask how roof penetrations are sealed/flashed before panels cover them.
- Verify conduit routes match what you approved, especially on visible walls.
- Keep pets and kids away from ladders, roof edges, and electrical work zones.
Weekly / Milestone Checks
- Request photos of roof attachments before panels go on.
- Confirm labeling and shutoff signage are being installed where required.
- Review any change order in writing before work continues.
- Make sure the crew leaves clear access to the main panel and meter area.

Inspections And Sign-Offs
In Los Angeles, inspections are where planning pays off. As a result, When the install matches the approved plans, you meet solar panels permit requirements without extra trips and scheduling delays. Overall, Keep your approved documents handy, and don’t treat inspection day like an afterthought.
What Inspectors Commonly Look For
- Secure roof attachments with proper flashing and weather sealing.
- Conduit and wiring installed neatly, protected, and sized correctly.
- Disconnects, breakers, and labels placed where they’re readable and accessible.
- Clear working space around electrical equipment and panels.
- Approved plans and equipment specs available on-site (digital copies work).
How To Reduce Re-Inspections
- Schedule inspections as soon as the install date is confirmed; slots can fill up.
- Do a walkthrough with the installer the day before inspection to catch quick fixes.
- Keep attic access clear if wiring runs through the attic.
- Don’t store items in front of electrical equipment; inspectors need clear access.
LADBS offers online services for permit management and scheduling. For this reason, Your installer typically coordinates this, but you should still ask for the inspection window so you can plan around it.
Accessibility And Safety Considerations
Solar isn’t usually thought of as an accessibility project, but smart placement and labeling make the system safer to operate for every household. It also helps future service technicians resolve issues without disrupting your routine.
- Ask for shutoff instructions and labels that are easy to read, not hidden behind equipment.
- Keep a clear path to the main electrical panel and meter area.
- Request a simple one-page 'how to shut down' guide to keep near the panel.
- Use monitoring alerts so you don’t need roof access for basic troubleshooting.
Final Walkthrough Checklist
Use this punch list before final payment. For example, It keeps documentation organized and makes future service, warranty claims, or a home sale much easier.
- Confirm the permit is finaled and you have a record of sign-off.
- Save approved plans, inspection notes, and equipment cut sheets in one folder.
- Verify the monitoring app is installed, connected, and showing production.
- Collect serial numbers and warranty info for major equipment.
- Walk the roofline from the ground and note any visible debris or loose tiles.
- Review the shutdown/startup procedure with the installer.
Ready to plan your Los Angeles solar project with a permit-first approach? For example, Schedule your free estimate online, or call +1 (916) 234-6696.
Helpful Links
Frequently Asked Questions
In most cases, yes. Rooftop solar in Los Angeles typically requires permits and inspections through LADBS because you’re attaching equipment to the structure and tying into your electrical system.
your utility usually requires an interconnection approval before it grants permission to operate. Your installer should confirm the exact steps for your address and scope.
Most rooftop systems involve a building review for the roof mount and an electrical review for wiring and disconnects. The inspection verifies the install matches the approved plan set.
- Roof mounting and weatherproofing details
- Electrical wiring, breakers, grounding, and labeling
- Disconnect locations, access, and working clearances
A strong plan set answers questions before plan check asks them. Ask for these items in writing before submittal.
- Site plan and roof layout showing panel locations
- Mounting/attachment details and flashing approach
- Electrical single-line diagram
- Equipment cut sheets (panels, racking, inverter, disconnects)
- Labeling plan and shutdown method
Timelines vary, but many homeowners see design and drawings in days, plan review in weeks, and installation in 1–3 days once the permit is issued.
In Los Angeles, plan review and inspection scheduling depend on workload and whether corrections are necessary. If you add a panel upgrade, roof work, or a battery, plan for extra time.
Permit and plan-check fees can vary by project valuation and scope. Instead of guessing, budget for city fees plus any engineering or electrical upgrade costs that apply to your home.
We recommend checking the current LADBS fee schedule during planning so your estimate accounts for permit costs from the start.
Yes. Tile, flat roofs, and older roof systems can change mounting details and may require additional structural documentation. Even when the permit path is similar, roof condition still affects what’s practical and safe.
If you’re considering a reroof, coordinate it before solar installation so you don’t pay twice for tear-offs and rework.
Often, yes. Batteries, EV chargers, and main-panel upgrades add electrical scope, which may require additional drawings, equipment specs, and inspections.
Bring those plans up during the estimate stage. When the design covers the full scope up front, you reduce re-submittals and avoid mid-project redesigns.
Licensed, insured & trusted local contractor
US Construction & Remodeling Corp.
9821 Business Park Dr, Sacramento, CA, 95827
Phone: +1 (916) 234-6696
CSLB License #: 1117562 Fully licensed and insured.