Restaurant build-outs, planned around the health plan review.
In Sacramento County, a new restaurant, a space converted into one, or a remodeled kitchen or restroom needs the Environmental Management Department to approve the plans first. We plan the build-out around those requirements, build it and coordinate the inspections. We have worked inside an operating Sacramento restaurant, from below the slab back to finished floors.
The address, the lease plan or photos, the menu and the equipment list. The County asks for the menu with the plans.
02
Plans and County plan review
The plans show every piece of equipment, the plumbing, the hood and the finishes. They go to Sacramento County Environmental Management, alongside the building permit.
03
Build and inspect
We build to the approved plans and schedule the field inspections before walls and floors are closed.
04
Final approvals
The County, building and fire finals come before opening. A food facility opens only after the County gives final approval and issues its health permit.
Our restaurant work
Two Sacramento restaurants.
Both were operating restaurants. Each project page shows the work, the order it was done in and the photos.
A handwashing sink in each prep area, a 3-compartment sink with drainboards that drains indirectly, a mop sink, and a prep sink where food is washed or thawed.
Yes. New food facilities, spaces converted into one, and kitchen or restroom remodels need the Sacramento County Environmental Management Department to approve the plans before construction. The approval expires one year after you apply.
Yes, with plans that go through the County plan review and the building permit. A conversion can need new drains, a grease interceptor connection, a hood and accessible restrooms, so we look at the space before you commit to a layout.
Sometimes. Our Sacramento sewer project was in an operating restaurant, and the work ran in two phases: plumbing and excavation first, then the interior restoration. Work inside the kitchen usually means closing that area.
It depends on the sewer agency and the menu. The City of Sacramento inspects grease traps and interceptors and requires restaurants to keep them clean. We confirm the requirement for your address during design.
It depends on the kitchen equipment, the hood, the plumbing under the slab, the restrooms and the finishes. We price it from your plans and the space in a written estimate.
Yes. In California, altering a commercial space also triggers upgrades to the route, entrance and restrooms serving it, within limits the state sets each year. Our accessibility page explains the rule.
Every day from 9 AM to 5 PM at (916) 234-6696. After hours, leave a voicemail and we will call you back.
Start your restaurant project
Send the space and the menu.
Send the address, the lease plan or photos, the menu and the equipment list. Call or fill out the form, and we come out to look at the space and take measurements. Interior and plumbing work carries our 1-year workmanship warranty.