Restaurant build-outs, planned around the health plan review.

In Sacramento County, a new restaurant, a space converted into one, or a remodeled kitchen or restroom needs the Environmental Management Department to approve the plans first. We plan the build-out around those requirements, build it and coordinate the inspections. We have worked inside an operating Sacramento restaurant, from below the slab back to finished floors.

What we build

The kitchen, the dining room and the systems behind them.

One contract from the plans to the final inspection.

01

Back of house

The kitchen layout the County reviews: sinks, equipment, hood, walk-in and storage, with floors, walls and ceilings that meet its finish rules.

  • Hand, prep, mop and 3-compartment sinks
  • Hood with make-up air
  • Food storage and walk-in boxes
02

Front of house and building systems

Dining room, counters and restrooms, and the plumbing and access work behind them. See our commercial plumbing and accessibility pages, and our bar and cafe build-outs.

  • Dining room, bar and counters
  • Restrooms and the accessible route
  • Drains under the slab and grease interceptor connections
Drain piping replaced along the kitchen wall of a Sacramento restaurant
Kitchen drain work in an operating Sacramento restaurant · View the documented project

How a build-out runs

From plan review to opening day.

Send the space and the menu

The address, the lease plan or photos, the menu and the equipment list. The County asks for the menu with the plans.

Plans and County plan review

The plans show every piece of equipment, the plumbing, the hood and the finishes. They go to Sacramento County Environmental Management, alongside the building permit.

Build and inspect

We build to the approved plans and schedule the field inspections before walls and floors are closed.

Final approvals

The County, building and fire finals come before opening. A food facility opens only after the County gives final approval and issues its health permit.

Our restaurant work

Two Sacramento restaurants.

Both were operating restaurants. Each project page shows the work, the order it was done in and the photos.

What Sacramento County checks

The plan review, item by item.

From the County’s 2026-27 plan review application. Your plans show each item before construction starts.

Item
What the plans and the build must show
Official page
When review is needed
New construction, a space converted into a food facility, and kitchen or restroom remodels. The approval expires one year after you apply.
Sinks
A handwashing sink in each prep area, a 3-compartment sink with drainboards that drains indirectly, a mop sink, and a prep sink where food is washed or thawed.
Hood
Drawings and calculations, with 100% make-up air that runs together with the exhaust.
Finishes
Smooth, non-absorbent floors with a 4 inch cove base, and smooth, washable walls and ceilings in prep, warewashing, janitorial and restroom areas.
Food storage
At least 144 sq ft for a restaurant, or 72 sq ft for a bar or a small facility.
Restrooms
Reached without walking through prep, warewashing or food storage areas.
Grease
The City of Sacramento inspects grease traps and interceptors, and restaurants must keep them clean.
Backflow
Backflow prevention assemblies are tested every year by a certified tester.

Restaurant questions

Before you sign a lease or a contract.

Trench with new drain piping and gravel bedding under a Sacramento restaurant floor

Start your restaurant project

Send the space and the menu.

Send the address, the lease plan or photos, the menu and the equipment list. Call or fill out the form, and we come out to look at the space and take measurements. Interior and plumbing work carries our 1-year workmanship warranty.