This is a sample project. Your page shows your own dates, photos and team.
Bathroom remodel
2418 Maple Street
Next up
Thu, Mar 26 · Tile startsWe lay out the first rows and send you a photo before we set them.
Before work starts
Feb 20
Contract signed Done
Your estimate became your contract, with one clear price for the work it lists.
Feb 24
Selections confirmed Done
You confirmed your tile, vanity, fixtures and glass. Items that take longer to arrive were ordered the same week.
Feb 25
Permit submitted Done
We prepare the paperwork and file the permit with the city. The permit fee is part of your price.
Mar 5
Permit approved Done
The city approved the permit and your work weeks went on the calendar.
On site
Mon, Mar 9 Week 1
Protection and demolition Done
We cover the floors from the front door to the bathroom and seal the doorway against dust. The old tub, tile and vanity come out.
For you: please clear the bathroom and the hallway. We work from 8:00 AM to 4:00 PM.
Wed, Mar 11 Week 1
Walls and floor checked Done
With the walls open we checked the framing and subfloor for water damage. One soft area by the old tub was fixed only after you and we signed change order CO 1.
Mar 16 to 18 Week 2
Plumbing and electrical Done
New shower valve and drain, vanity supply lines, fan and lighting wiring. We tell you at least an hour before the water goes off.
Thu, Mar 19 Week 2
City inspection before the walls close Passed
The inspector checks the plumbing and electrical work while the walls are still open. The report is in your documents.
Mon, Mar 23 Week 3
Shower waterproofing Done
New walls go up and the whole shower gets a waterproof layer, including the floor, the niche and every corner.
Tue, Mar 24 Week 3
Water test Today
We fill the shower floor and let it stand to prove there are no leaks before any tile goes on.
Mar 26 to Apr 3 Weeks 3 and 4
Tile Upcoming
Shower walls, niche and floor tile, then grout and sealing.
Apr 6 to 10 Week 5
Vanity, fixtures and paint Upcoming
The vanity and top go in, then the faucet, toilet, mirror, lights, fan and fresh paint.
Apr 13 to 15 Week 6
Glass, final inspection and walkthrough Upcoming
The glass door is measured once the tile is set and installed in week 6. After the city signs off, we walk through with you and hand over your warranty documents.
Dates can move if the city reschedules an inspection or a product arrives late. When a date changes, you get a message on your project page.