Bathroom remodeling · Sacramento

Step-by-Step Bathroom Remodeling Guide

A bathroom remodel runs in a set order: plan, permit, open up, rough-in, inspect, waterproof, finish.

Each step, what you decide at it, and the Sacramento inspections and rules along the way.

Finished Roseville bathroom with a glass shower, grab bar, vanity and toilet
The finished Roseville bathroom. New shower, glass enclosure, grab bar and vanity.

Sample project

What will you see during your bathroom remodel?

Your remodel gets its own project page: a timeline with dates, messages from your team, photos and documents in one place. Here is a sample bathroom remodel; the address, names and dates are examples.

See the sample timelineSee the sample project page

US Construction Remodeling Corp.Customer portal

This is a sample project. Your page shows your own dates, photos and team.

Bathroom remodel

2418 Maple Street

Hall bathroom · Tub to walk in shower

In progressWeek 3 of 6

Next up

Thu, Mar 26 · Tile starts

We lay out the first rows and send you a photo before we set them.

Before work starts

  1. Feb 20

    Contract signed Done

    Your estimate became your contract, with one clear price for the work it lists.

  2. Feb 24

    Selections confirmed Done

    You confirmed your tile, vanity, fixtures and glass. Items that take longer to arrive were ordered the same week.

  3. Feb 25

    Permit submitted Done

    We prepare the paperwork and file the permit with the city. The permit fee is part of your price.

  4. Mar 5

    Permit approved Done

    The city approved the permit and your work weeks went on the calendar.

On site

  1. Mon, Mar 9 Week 1

    Protection and demolition Done

    We cover the floors from the front door to the bathroom and seal the doorway against dust. The old tub, tile and vanity come out.

    For you: please clear the bathroom and the hallway. We work from 8:00 AM to 4:00 PM.

  2. Wed, Mar 11 Week 1

    Walls and floor checked Done

    With the walls open we checked the framing and subfloor for water damage. One soft area by the old tub was fixed only after you and we signed change order CO 1.

  3. Mar 16 to 18 Week 2

    Plumbing and electrical Done

    New shower valve and drain, vanity supply lines, fan and lighting wiring. We tell you at least an hour before the water goes off.

  4. Thu, Mar 19 Week 2

    City inspection before the walls close Passed

    The inspector checks the plumbing and electrical work while the walls are still open. The report is in your documents.

  5. Mon, Mar 23 Week 3

    Shower waterproofing Done

    New walls go up and the whole shower gets a waterproof layer, including the floor, the niche and every corner.

  6. Tue, Mar 24 Week 3

    Water test Today

    We fill the shower floor and let it stand to prove there are no leaks before any tile goes on.

  7. Mar 26 to Apr 3 Weeks 3 and 4

    Tile Upcoming

    Shower walls, niche and floor tile, then grout and sealing.

  8. Apr 6 to 10 Week 5

    Vanity, fixtures and paint Upcoming

    The vanity and top go in, then the faucet, toilet, mirror, lights, fan and fresh paint.

  9. Apr 13 to 15 Week 6

    Glass, final inspection and walkthrough Upcoming

    The glass door is measured once the tile is set and installed in week 6. After the city signs off, we walk through with you and hand over your warranty documents.

Dates can move if the city reschedules an inspection or a product arrives late. When a date changes, you get a message on your project page.

See the sample project pagePlan my bathroom

US Construction Remodeling Corp.Customer portal

This is a sample project page. The address, names, dates and messages are examples.

Bathroom remodel

2418 Maple Street

Hall bathroom · Tub to walk in shower

In progressWeek 3 of 6

Messages

Your project team

Wed, Mar 11

Site lead · 8:05 AM

Good morning Daniel. The old tub and tile are out, and the photos are in Updates. This morning we check the framing and the floor under the old tub.

Site lead · 11:40 AM

The framing is dry and solid. The subfloor right under the old tub drain is soft from a slow leak, about 3 by 4 feet.

Project manager · 12:15 PM

We sent you change order CO 1 for that section, with its price and its effect on the schedule. We start that work only after we both sign it.

Change order CO 1Signed by both

Replace the damaged subfloor under the tub

ScheduleNo change

You · 12:40 PM

Signed. Thanks for sending the photos.

Site lead · 3:30 PM

The new subfloor is in and ready for the plumber on Monday.

Today

Project manager · 8:10 AM

The shower waterproofing is done. Today we fill the shower floor with water and leave it overnight to prove it does not leak.

You · 8:24 AM

Is the water on for the rest of the house?

Site lead · 8:30 AM

Yes, everything else works as usual. Please keep the bathroom door closed so nobody steps into the shower.

Project manager · 3:55 PM

First check looks good, the water level has not moved. We read it again tomorrow morning and start tile on Thursday.

Next up

Thu, Mar 26 · Tile starts

We lay out the first rows and send you a photo before we set them.

See the full timeline →

Updates

Photos from the crew
Our Roseville bathroom remodel with the old finishes removed and the shower wall open to the framing

Walls open, old tub out

Wed, Mar 11 · Ready for the new plumbing

The photo comes from our Roseville remodel.

Documents

Always here
  • Signed contractFeb 20

    Signed
  • Your selectionsFeb 24 · Tile, vanity, fixtures, glass

    Confirmed
  • Bathroom permitMar 5

    Approved
  • Change order CO 1Mar 11 · Signed by both sides before the work

    Signed
  • Inspection before the walls closeMar 19

    Passed
  • Warranty documentsAfter the walkthrough

    Later

Your team

  • Project managerSchedule, permits and inspections
  • Site leadIn your home every work day
  • OfficeDocuments and payments

One message here reaches the whole team.

See the sample timelinePlan my bathroom remodel

Questions about your own project? Call 916.234.6696.

The steps

In what order should a bathroom remodel be done?

Ten steps, and what you decide at each one.

  1. Measure and design

    Decide what stays and what moves. For bathrooms our 3D design is free, and you see the price with it.

  2. Permit

    Fixtures and finishes replaced in kind: a Minor Bathroom Remodel Permit, without plans. New or moved openings in the bathroom walls: full plan review.

  3. Order and protect

    Order the vanity, the valve, the tile and the glass early. Protect the floors and the path through the house.

  4. Demolition

    Remove only what is changing.

  5. Check what is behind

    We photograph what the open walls show. Any added repair is priced in writing, and you approve it before it goes ahead.

  6. Framing and rough-in

    Framing, backing, plumbing, electrical and the fan duct, then the rough inspection.

  7. Backer and waterproofing

    Cement board or a gypsum board approved for showers, never greenboard, and a smooth, nonabsorbent surface at least 6 feet up the shower walls. We flood-test the waterproofing before any tile goes on.

  8. Tile

    The floor slopes to the drain, then the walls, the niche and the trim.

  9. Fixtures and finish

    The vanity, the toilet, the valve trim, the glass, the lights, the outlets and the fan with its humidity control.

  10. Final inspection and walkthrough

    The final inspection, then a walkthrough and your list. Bathroom work carries our 1-year workmanship warranty.

Roseville bathroom during the remodel, with the wall opened before backing and waterproofing
The Roseville bathroom at step 5, with the wall open before backing and waterproofing.

Hidden damage

What is the hardest part of a bathroom remodel?

What the walls and floor hide.

What shows up

Old leaks, soft subfloor and outdated pipes show only after demolition.

How we handle it

We photograph it, price it in writing, and you approve it before the repair goes ahead.

Getting the water right

The backer, the waterproofing, the slope and the valve have to be right before tile covers them.

Opened wall at a leaking shower valve with its copper piping
An opened wall at a leaking shower valve, found during a repair.

Inspections

What will the inspector look for?

From the City’s bathroom remodel handout, CDD-0418, revised January 2026.

What Sacramento checks in a bathroom
What it checks
Rough inspectionFraming, plumbing, electrical and ventilation, before the walls close
Shower wallsA smooth, nonabsorbent surface at least 6 feet above the floor (CRC R327.2); no greenboard backer
Shower valvePressure-balanced or thermostatic when the surround is removed or the valve is replaced (CPC 408.3)
Outlets and lightsA 20-amp GFCI-protected circuit for the outlets near the sink; no outlet in the tub or shower space; fixtures over the shower rated for damp or wet locations
FinalThe fixtures, the fan with its humidity control, and the water-use limits

Living at home

Can you live at home during a bathroom remodel?

Usually, with a plan.

Another bathroom

If the house has a second working bathroom, families can usually stay.

Protection

We cover the floors and keep a clean path through the house and a closed-off work area.

Updates

You know what happens next at each step, and every change comes to you in writing first.

Remodeled Roseville bathroom with a glass shower enclosure, grab bar and white vanity
The finished Roseville bathroom with its glass enclosure and vanity.

About the author

Who wrote this guide?

Our Chief Designer wrote this guide.

Written by Emin

Chief Designer

Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.

Planning tools

Which tools help plan a bathroom?

Price the room with the bathroom budget estimator, or count tile with the tile and grout calculator.

Bathroom step questions

What else do people ask about the steps of a bathroom remodel?

Short answers from the City’s rules and our own bathrooms.

In what order should a bathroom remodel be done?

Design and permit, demolition, framing and rough plumbing and electrical, the rough inspection, backer and waterproofing, tile, then fixtures and the final inspection.

What is the hardest part of a bathroom remodel?

What the walls hide. Old leaks and soft subfloor show only after demolition, and they have to be fixed before the shower is built.

Do I need a permit for a bathroom remodel in Sacramento?

For most work, yes. In-kind replacement can use a Minor Bathroom Remodel Permit without plans; new or moved openings in the bathroom walls need plan review.

What gets inspected?

Framing, plumbing, electrical and ventilation before the walls close, then a final inspection. Our Roseville remodel passed its framing, plumbing, electrical and final inspections.

Do you test the shower before tiling?

Yes. We flood-test the shower waterproofing before the tile goes on; it is its own line in our estimates.

Can we keep living at home during the remodel?

Usually, if another bathroom works. We protect the floors and the path through the house.

What warranty do you give on bathroom work?

Bathroom work carries our 1-year workmanship warranty.

Planning a bathroom?

Know every step before the first wall opens.

Send the address, a few photos and what you want to change. We design it with you in 3D, free for bathrooms, and send a written estimate.

This website uses cookies to improve your web experience.
Explore
Drag