What it is
A water resistive barrier: the sheet between the sheathing and the siding that sends water that gets past the siding back out.
Free 3D design for any room in your home, siding or roof, before you sign · 10% off for veterans and seniorsFree 3D design · 10% off for veterans and seniors
Siding · Sacramento County
House wrap is the water resistive barrier between the sheathing and the siding, the layer that sends water getting past the siding back out. On our Florin siding job it went over about 1,550 sq ft of new plywood, in a $30,450 contract that came to $33,150 with a $2,700 change order for rotted framing.
We always apply for the permit ourselves; the County passed the sheathing inspection on September 23 and the final on September 30, 2026. Below: what the 2025 California code asks for, how the wrap went on, and what to ask in a siding bid.

A water resistive barrier: the sheet between the sheathing and the siding that sends water that gets past the siding back out.
At least one layer over the studs or sheathing, continuous behind the siding, lapped so water runs out (R703.2).
In Florin, new plywood, house wrap, 320 feet of flashing and James Hardie lap siding on about 1,550 sq ft: a $30,450 contract, $33,150 with the $2,700 framing change order.
Water barrier
Siding sheds most rain, but some water gets behind it at joints, nails and openings. House wrap is the layer that sends that water back out.
From the inside out: studs, sheathing, house wrap, flashing at the openings, then the siding. Our sheathing guide covers the panel layer.
Each upper course laps over the one below, like shingles, so water on the wrap runs down and out.
At windows, doors and trim, flashing laps into the wrap; our siding flashing guide shows where.
House wrap, building wrap, weather resistive barrier and WRB mean the same layer. Older walls may have asphalt felt or building paper instead, and the code still lists No. 15 felt.


The code
Section R703.2 of the 2025 California Residential Code covers the water resistive barrier behind siding.
Not fewer than one layer goes over the studs or the sheathing of every exterior wall, with flashing at openings as R703.4 describes.
It runs to the top of the wall, stays continuous behind the siding and behind deck ledgers, and is finished at penetrations so the wall still keeps water out.
No. 15 asphalt felt (ASTM D226 Type 1), a house wrap that meets ASTM E2556 Type 1 or 2, a foam sheathing system, or another approved material installed by its instructions.
Felt and ASTM E2556 wraps go on horizontally, the upper layer over the lower by at least 2 inches, and by at least 6 inches where ends meet.


Under stucco the code asks for more: in dry climate zones, for example, two layers of Grade D paper or an equal barrier (R703.7.3).
Our job
A full re-siding of a home in Florin, Sacramento County, signed on September 1, 2026. More of our work around Sacramento and on our siding page.
The drawings show each step. The text and the photos below are from our Florin job.

We removed the old siding and checked the framing. Replacing 11 rotted framing members was a $2,700 change order the homeowner signed first.

New 15/32 inch plywood went over the walls, and the County sheathing inspection passed on September 23, 2026.

The wrap covered about 1,550 sq ft of new plywood, the weather resistive barrier named in the contract.

About 320 feet of opening, transition and penetration flashing went in with the wrap. The existing windows stayed in place.

James Hardie lap siding and trim went on last, and the County final inspection passed on September 30, 2026, two weeks before the contract’s target finish date.


See every photo of the Florin job and the homeowner’s video.
See the Florin projectGet my free estimateBefore you sign
Ask for the water layers in writing, not only the siding.
Whether new wrap goes on every wall in the bid. Ours put a new barrier over new sheathing.
Studs, old sheathing or new plywood. Ours named new 15/32 inch plywood under the wrap.
Which openings, transitions and penetrations get flashing. Ours named 320 feet.
Whether the permit and inspections are in the price. We always apply for the permit ourselves, and on the Florin job the fees were in the price.
How rotted wood under the old siding is priced. On our job it was a written change order signed before the work.
Google reviews
Two homeowners on their new siding.
My siding was old and needed to be replaced. These guys handled from start to finish everything like a magic, I’m glad to choose using us construction, I can recommend them to anyone who wants to improve their property.
Mike Stamey, Google review
I called them and the company estimator came same day and they replaced my siding with a new one, great job
Erick C., Google review
About the author
Our Chief Designer wrote this guide.
Chief Designer
Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.
Sources
The state code section on house wrap, where the codes are published, the siding we used and our license.
R703.2: the water resistive barrier behind siding, its materials and its laps.
Where the California building codes are published.
The James Hardie lap siding we installed on the Florin job.
California contractor license #1117562 on the state license board.
Plan the materials
Measure the walls first; the wrap covers the same area.
Work out siding for your walls, or price a dry rot repair.
Siding calculatorDry rot repair costGet my free estimatePractical questions
Short answers about the code, felt, laps, permits and old siding.
Yes. The 2025 California Residential Code asks for at least one layer of water resistive barrier over the studs or sheathing of every exterior wall of a house (R703.2).
Over it. The plywood or other sheathing is nailed to the studs, and the wrap goes on the outside of it, under the siding.
Yes. The code lists No. 15 asphalt felt (ASTM D226 Type 1) next to house wraps that meet ASTM E2556.
Felt and ASTM E2556 wraps go on horizontally, with the upper layer lapped over the lower by at least 2 inches, and by at least 6 inches where ends meet (R703.2).
We always apply for the permit ourselves. Our Florin job had a County permit with sheathing and final inspections, and the fees were in the price.
When asbestos siding turns up, we work with a licensed abatement company, and the removal is done before the new wrap and siding go on.
A full new siding installation comes with our workmanship warranty for 10 years. The first 2 years have full coverage; after that, the limited coverage written in your contract applies.
Plan your project
Send your address and a few photos of the walls. We look for free and send a written price that names the wrap, the flashing and the permit before any work starts.
US Construction Remodeling Corp. · CSLB #1117562 · 4424 Freeport Blvd. STE 4, Sacramento, CA 95822
Keep planning
Our siding service, the Florin job, two siding guides and the siding cost guide.