Portfolio: Complete Interior Remodel in Roseville, CA

Skip links
Completed open concept kitchen remodel with a waterfall quartz island, white cabinetry, wood slat accents, and recessed lighting in Roseville, California.

Roseville, California

Designed, Permitted, and Built as One Connected Remodel

A complete interior transformation centered on a redesigned kitchen, two renewed bathrooms, custom storage, and cohesive finishes throughout.

Permit Drawings
3D Cabinet Design
Quartz Surfaces
Finishes Throughout the Home

Project overview

More Than a Cosmetic Update

This Roseville project began with documentation, planning, and visualization long before demolition. Our team coordinated the permit drawings, architectural and engineering input, Title 24 and energy code details, cabinet design, procurement, construction, and final detailing.

The result is a brighter, more open home with a new kitchen layout, two remodeled bathrooms, reconfigured laundry and storage areas, new flooring, fresh paint, updated lighting and devices, and custom features designed around the homeowner’s daily routines.

Location
Roseville, California
Project
Complete interior remodel
Duration
Approximately six weeks
Completed
July 2026
Planning
Permit drawings, engineering coordination, Title 24
Design
3D cabinetry, finish samples, design revisions
Build
Kitchen, two bathrooms, closets, laundry, flooring and finishes
Inspections
Framing, plumbing, electrical and final inspections passed
From design through construction

From Permit Set to Final Walkthrough

One coordinated team kept the approved design, field conditions, material selections, and construction details connected from start to finish.

01

Plan

Existing, demolition, proposed, electrical, and lighting plans prepared for permit coordination.

02

Visualize

Cabinet proportions, layout, finishes, and storage accessories developed through 3D drawings and renderings.

03

Refine

Samples and design revisions reviewed with the homeowner before cabinets and key materials were ordered.

04

Build and inspect

Construction was completed in approximately six weeks, with the required framing, plumbing, electrical, and final inspections passed before closeout.

Kitchen transformation

A Cleaner Layout With Custom Function Built In

The former soffit and a nonstructural partition were removed. The refrigerator wall was reframed, and the affected wall and ceiling surfaces were rebuilt to create a more open kitchen.

Completed Roseville kitchen with a new open layout, cabinetry that reaches the ceiling, and a marble inspired quartz waterfall island.
Original Roseville kitchen during early construction before the layout, cabinetry, lighting, and finishes were transformed.
Before / Early Construction
After

Drag the handle left or right to compare the matched kitchen viewpoints.

Angled view of a finished Roseville kitchen with a marble inspired quartz waterfall island and gray and white cabinetry.

Cabinetry and surfaces

Marble Inspired Quartz With a Clean Waterfall Edge

The final kitchen uses durable quartz countertops with a marble inspired pattern. A waterfall island end, gray and white cabinetry, and warm wood accents complete the design.

  • Gray base cabinets and soft white wall cabinets
  • Tall storage and upper cabinetry extended toward the ceiling
  • Sliding organizers and a Lazy Susan corner solution
  • Updated sink and refrigerator plumbing for the new layout
  • New receptacles, switches, lighting, and appliance connections
  • Wood slat wall panels and a coordinated barn door feature

Two bathrooms

New Shower Systems and a Complete Finish Refresh

Both bathrooms were rebuilt with new shower systems and enclosures, vanities, countertops, mirrors, faucets, lighting, GFCI outlets, flooring, wall repairs, paint, and final detailing.

Required backing, waterproofing components, ventilation coordination, and safety preparation were addressed as part of the complete scope.

Roseville bathroom during construction before the new shower system, vanity, lighting, and finishes were installed.
Completed Roseville bathroom remodel with a new shower enclosure, vanity, mirror, lighting, fixtures, and flooring.

Complete scope

Details That Carry the Design Through the Home

PlanningPermit drawings, architectural and engineering coordination, Title 24, and energy code coordination.
InspectionsRequired framing, plumbing, electrical, and final inspections completed and passed.
KitchenLayout changes, gray and white cabinetry, sliding organizers, Lazy Susan storage, marble inspired quartz surfaces, plumbing, electrical, lighting, wall panels, and barn door detailing.
BathroomsTwo remodeled bathrooms with new shower systems and enclosures, vanities, mirrors, fixtures, lighting, devices, flooring, and paint.
StorageThree rebuilt closet areas, a reconfigured primary closet, integrated LED lighting, and a coded cabinet for valuables.
Interior finishesNew LVP flooring, transitions, trim, wall and ceiling repairs, paint, refinished doors, hardware, switches, and outlets.
Specialty workLaundry room updates, barn door systems, wood slat accents, and a fire rated service door between the garage and home with an automatic closer.
2026 investment guide

What Does a Comparable Roseville Remodel Cost?

For a project with a comparable design and construction scope, US Construction & Remodeling currently recommends a planning range from $145,000 to $165,000 or more.

This range accounts for coordinated permit drawings, 3D design, kitchen and bathroom remodeling, custom storage, flooring, painting, electrical and plumbing work, required inspections, and project closeout.

Custom closet storage system with shelving, hanging space, integrated lighting, and organized cabinetry in a Roseville remodel.
Finished Roseville kitchen viewed from the hallway with tall cabinetry, quartz surfaces, and a bright open layout.
Closets and finishes throughout the home

Storage Designed Around Daily Life

Three closet and storage areas received new shelving and hanging systems. The primary closet was fully reconfigured with integrated LED lighting and a coded cabinet for securing valuables.

New LVP flooring, refreshed walls and ceilings, updated interior doors and hardware, replaced switches and outlets, trim work, and fresh paint created a consistent finish from room to room.

Finished details

The Final Roseville Interior

Project questions

Roseville Remodel FAQs

Did this project include permit and design work?

Yes. The scope included permit drawings, architectural and engineering coordination, Title 24 and energy code details, electrical and lighting documentation, and design revisions before construction.

How long did the Roseville remodel take?

Active construction was completed in approximately six weeks, with the project finished in July 2026.

Did the remodel pass its required inspections?

Yes. The project passed the required framing, plumbing, electrical, and final inspections before closeout.

What should homeowners budget for a comparable Roseville remodel?

For 2026 planning, US Construction & Remodeling recommends a range from approximately $145,000 to $165,000 or more for a comparable design and construction scope. Existing conditions, selections, engineering, permits, layout changes, and upgrades determine the final proposal.

Were the kitchen countertops marble?

No. The finished surfaces are marble inspired quartz, selected for the visual character of veined stone and the practical performance of an engineered quartz surface.

How was the kitchen designed before ordering cabinets?

The team developed detailed plans and 3D visualizations, reviewed samples, and completed several rounds of revisions with the homeowner before the cabinet package was approved and ordered.

What areas of the home were remodeled?

The project included the kitchen, two bathrooms, laundry area, three closet or storage areas, the primary closet, flooring, walls and ceilings, interior doors and hardware, lighting, switches, outlets, trim, and related finish work.

Start your project

Planning a Remodel in Roseville?

Bring the plans, design, permitting, and construction together with one experienced team.

Free estimate

DOCUMENTED ROSEVILLE DESIGN-BUILD PROJECT

The finished rooms connect to a permit, design, and field record

This case study is supported by the project permit record, coordinated design documents, a phase-based construction schedule, inspection activity, and completed work photographs. Customer identity, the private street address, internal correspondence, and the homeowner contract price are not published.

01

Design and permit coordination

Permit drawings, architectural and engineering coordination, Title 24 information, cabinet design, and finish revisions were organized before affected work advanced.

02

Public permit record

Roseville permit BD25-6577 was issued January 27, 2026. The public project record shows Final Building Approved June 11, 2026.

03

Managed construction sequence

The working schedule tracked preconstruction, protection, demolition, framing and MEP rough-ins, kitchen and bathroom installation, finishes, quality control, and change management.

04

Project-specific limits

The record demonstrates this project’s documented process. It is not City endorsement and does not guarantee another project’s scope, permit path, cost, schedule, or result.