Whole-home remodel · Sacramento

Whole-Home Remodel Cost and Timeline in Sacramento

Our Roseville whole interior remodel (two bathrooms, kitchen, closets, floors) was a $99,302 signed contract (2026), and the final price was the same, with no change orders.

That remodel had about six weeks of active construction. Your own price comes from a written estimate after we measure and you choose the design.

Roseville kitchen after the remodel, with quartz counters and gray and white cabinets
The Roseville kitchen after the remodel. The project behind this guide.

The Roseville job

What did the Roseville remodel include?

A $99,302 signed contract (2026). Your price comes from a written, itemized estimate.

The Roseville scope

A new kitchen layout, two remodeled bathrooms, laundry and storage changes, new flooring, paint, lighting and devices.

Planning and permits

Permit drawings, 3D design, engineering and energy code details, and the required inspections.

Construction

A soffit and a nonstructural wall removed, the refrigerator wall reframed, new cabinets and quartz, new showers, plumbing and electrical updates.

What moves your price

Existing conditions, your materials and fixtures, engineering, the permit scope, layout changes and upgrades.

Roseville kitchen before the remodel
Before: the Roseville kitchen.
Remodeled Roseville bathroom with a glass shower and a new vanity
After: one of the two remodeled bathrooms.

Timeline

How long does a whole-home remodel take?

Two clocks: the whole project, and the time the crews are in your house.

Before construction

Measuring, design in 2D and 3D, selections and the permit. Its length depends on your decisions and the city review.

Active construction

About six weeks in Roseville, with framing, plumbing, electrical and final inspections passed before closeout.

The permit record

Roseville permit BD25-6577 was issued in January 2026 and approved in June 2026. Those dates show city steps, not the construction time.

Finished

The Roseville project was finished in July 2026.

Roseville existing and proposed kitchen, bathroom and laundry plans
Existing and proposed plans drawn before the Roseville estimate was final.

Cost drivers

What changes a whole-home budget the most?

Two houses of the same size can need very different work.

Layout and walls

Keeping walls, plumbing and cabinets where they are costs less than moving them. Removing walls can add engineering, framing and inspections.

Systems behind the walls

The electrical panel and circuits, plumbing, heating and cooling, insulation and any damage found when walls are opened.

Cabinets and finishes

Cabinets, counters, tile, flooring, fixtures and lighting. Allowances hold a place for choices not made yet.

Living at home and phasing

Protection, a temporary kitchen or bathroom, and how many times crews set up all affect the price.

At once or in phases

Should you remodel all at once or in phases?

Four ways to organize the work.

Ways to phase a whole-home remodel
How it worksWatch for
All at onceOne setup, one protection plan, one scheduleYou may need to move out for part of it
Room by roomFinish one area before starting the nextRepeated setup and matching finishes later
Systems firstPanel, plumbing, ducts and framing before finishesRooms are opened early
What you need most firstThe only kitchen or bathroom gets done firstRushing a room can cause rework

Plan the stages with our phased remodeling roadmap, and the living arrangements with our guide to living through a remodel.

Comparing estimates

How should you compare whole-home estimates?

Compare the lines before the totals.

Measured work

Rooms, dimensions, what is removed, what stays and what is new.

Allowances

Each allowance named, with what happens if your choice costs more or less.

What is left out

Design, engineering, hidden damage, service upgrades and anything you supply yourself.

About the author

Who wrote this guide?

Our Chief Designer wrote this guide.

Written by Emin

Chief Designer

Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.

More planning tools

Which tools help plan a whole-home budget?

Price parts of the work with our bathroom budget estimator and countertop calculator.

Whole-home questions

What else do homeowners ask?

Short answers from the Roseville project and our estimates.

How much does a whole-home remodel cost in Sacramento?

Our Roseville whole interior remodel (two bathrooms, kitchen, closets, floors) was a $99,302 signed contract (2026), and the final price was the same, with no change orders. Your own price comes from a written estimate for your home.

What did the Roseville scope include?

A new kitchen layout, two remodeled bathrooms, laundry and storage changes, new flooring, paint and lighting, with permit drawings, 3D design and inspections.

How long does a whole-home remodel take?

Our Roseville remodel took about six weeks of active construction. Design, selections and the permit come before that, and their length depends on your project.

Is the permit valuation the project cost?

No. The city uses it for the permit fee. The Roseville permit lists a valuation of $15,712.58; that is the city’s figure, not what the project cost.

Is remodeling all at once cheaper than in phases?

Often, because protection, setup and trade visits happen once. Phases can keep part of the home usable. We price both when you ask.

Can we live at home during the remodel?

Sometimes. It depends on whether you keep a working bathroom, a place to cook and a safe path through the house. We plan it with you before work starts.

From result to written estimate

Start with your own house.

Tell us which rooms you want to change and what should stay. We measure, design it with you and send a written estimate.