Load-bearing walls
A new beam and posts carry the load down to footings. In the City of Sacramento, structural changes go to plan review before the permit is issued.
Free 3D design for any room in your home, siding or roof, before you sign · 10% off for veterans and seniorsFree 3D design · 10% off for veterans and seniors
Whole-home remodeling · Sacramento
A load-bearing wall can come out of an older Sacramento home when a new beam and posts carry its weight down to the foundation, under a building permit with inspections. US Construction Remodeling can design the open layout, have a structural engineer size the beam and build the opened space to current code.
We always apply for the permit ourselves, and anything hidden in the walls is priced in a written change order you sign before that work goes ahead. Below: which walls carry weight, what the code asks of a remodel, the surprises older homes hide and what to fix first.

A new beam and posts carry the load down to footings. In the City of Sacramento, structural changes go to plan review before the permit is issued.
The work you change is built to current code, and a permitted remodel adds smoke alarms as in a new home.
Rot, mold and asbestos are shown to you and priced in writing before that work goes ahead.
Open it up
Often, yes. What it takes depends on what each wall carries and what runs inside it.
It holds up ceiling joists, a floor or the roof above. It can come out when a new beam and posts take over its load, as the next section shows.
It only divides rooms and carries nothing from above. It can come out without a beam once the wiring, pipes and ducts inside it are moved.

A soffit, the boxed-in ceiling over many kitchens, often hides a duct or a pipe. Rerouting them lets the ceiling run flat, and a half wall at a counter can give way to an open counter.

Before a wall comes out, we check it for wiring, pipes, gas lines and ducts, and plan where each one goes.

Load-bearing walls
For structural integrity and long-term safety, the new beam, posts and footings are sized by a structural engineer, built under a permit and inspected before drywall closes them in. Five steps, in order.

We look in the attic and under the floor to see which ceiling joists, rafters or floor framing rest on the wall.

A structural engineer sizes the new beam, the posts at each end and the footing under each post, so the load reaches the ground.

In the City of Sacramento, structural changes go in as plans for review before the permit is issued.

A temporary wall on each side holds up the ceiling while the old wall comes out and the beam goes in.

The inspector sees the beam, the posts and their metal connectors before drywall closes them in.
Send photos of the wall you want gone and the rooms on both sides.
Get my free estimateWhole-home remodelingCurrent code
The 2025 California codes have been in force since January 1, 2026. The work you change is built and inspected to them, and a permitted remodel brings a few things in the rest of the house up to date.

When a remodel needs a permit, the home gets smoke alarms where the code places them in a new home (R310.2.2), such as in each bedroom and in the hallway outside the bedrooms. For some work, such as roofing, siding or windows, battery alarms are allowed.

A home with a gas appliance, a fireplace or an attached garage that opens into the house needs carbon monoxide alarms, older homes included (R311.2.1).

In a single-family home built on or before January 1, 1994, any permitted alteration means replacing older fixtures before final permit approval. That covers a toilet over 1.6 gallons per flush, a showerhead over 2.5 gallons per minute and an indoor faucet over 2.2 gallons per minute.
The City’s interior remodel questionnaire lists removing, adding or changing walls, and notes that structural changes need plans reviewed before the permit. Framing outside the code’s conventional rules needs a design stamped by a California licensed engineer or other licensed design professional (R301.1.3.1).
Framing, wiring and plumbing are inspected before the walls close, and the job ends with a final inspection. More on our permits and inspections page.
Unfinished work
Yes. The usual path: put the work on a permit, let the inspector see it, fix what does not pass and finish the job. If a contractor walked off the job, start with our guide to what to do when a contractor abandons a remodel.
We read any plans and permits that exist and look at the framing, wiring and plumbing already in place.
The City of Sacramento requires a permit for remodeling and repairs. Getting the existing work onto a permit is how it gets inspected, and we always apply for the permit ourselves.
Work already closed in may have to be opened so the inspector can see the framing, wiring or plumbing behind it.
Anything that does not meet code is corrected, the rest of the work is finished, and the job closes with the final inspection.
Hidden problems
Older homes often hide damage behind drywall and under floors. Nothing hidden is fixed without your approval: we stop, show you and price it in a written change order you sign first.

Rotted studs, plates or joists are cut out and replaced, and each new stud or joist is fastened in before the walls close.

Mold grows where water gets in. EPA says to fix the water problem and clean up mold promptly, and the California Department of Public Health says to correct the water source, so we find the leak and repair it before the wet materials are replaced.

Some older materials, such as a popcorn ceiling or old flooring, may contain asbestos. Test first: EPA advises an inspection before a remodel and says taking samples yourself is not recommended. If a test finds asbestos, we work with a licensed abatement company, and the removal is done before our work goes on.
Wiring, pipes and ducts found inside opened walls are checked, and anything unsafe is shown to you before it is fixed.
A sagging floor, a door that sticks or a crack running from the corner of a door can mean the framing or the foundation has moved. A structural engineer looks at it before the remodel is designed.
Read how a change order works in our guide to signing a remodeling contract.
Get my free estimateNow or later
Fix what is unsafe or hidden first, and leave the finishes for a later phase if the budget is tight.
Structural damage, active leaks, gas or electrical hazards and missing smoke or carbon monoxide alarms come first.
Wiring, pipes, ducts and insulation are easiest to replace while the walls and ceilings are open, before new drywall goes up.
Paint, flooring, cabinets and lighting can wait for a later phase, as long as the work under them is done.
A plan for the whole house keeps the next phase from tearing out this one: the wiring and plumbing for a future kitchen can go in while the walls are open.
Your written estimate can split the work into phases, each with its own price. Read what happens before a remodel starts.
Keep the character
An open plan does not have to feel industrial. Keep what makes the house yours and change what does not work.
Original trim, doors, built-ins and wood floors can be repaired and kept, and new trim can match the old profiles. Our remodel design style guide explains how to match new work to the floors and trim you keep.
A wide cased opening, an island or a half wall with shelves can join rooms and still give each one its place. Wood, tile and warm lighting keep it from feeling industrial. See kitchen layouts for Sacramento homes.
A builder-grade tract home gets a custom look from the layout, flat ceilings where soffits were, built-ins, trim and lighting, not only from new finishes.
For a City of Sacramento landmark or a home in a historic district, preservation review covers exterior changes such as windows, siding, roofs and additions, before the building permit. Interior work is typically not reviewed.
Our designers draw the floor plans the City asks for and show the new layout in 3D first. Read about design and permit plans.
About the author
Our Chief Designer wrote this guide.
Chief Designer
Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.
Sources
The state code and laws, the City of Sacramento’s own pages and federal guidance.
R310.2.2 smoke alarms and R311.2.1 carbon monoxide alarms in existing homes, and R301.1.3.1 on engineered design.
Older toilets, showerheads and faucets replaced before final permit approval.
The flow limits for a noncompliant toilet, showerhead or faucet.
A permit for remodeling and repairs.
Removing, adding or changing walls, and plan review for structural changes.
Preservation review of exterior changes to historic homes.
An inspection before a remodel; taking samples yourself is not recommended.
Fix the water problem and clean up mold promptly.
Find and correct the source of water.
California contractor license #1117562 on the state license board.
Planning tools
Count the drywall for the rooms you open, or price a rot repair.
Measure first, then send us the numbers for a written price.
Drywall calculatorDry rot repair costGet my free estimatePractical questions
Short answers about walls, beams, permits, code and hidden problems.
Look at what rests on it. Ceiling joists, floor joists or roof framing sitting on top of a wall usually mean it carries weight. We check in the attic and under the floor before we price the work.
Often. A flush beam is set up into the ceiling framing so the ceiling stays flat; a dropped beam hangs below it. The framing above and the engineer’s design decide which one fits.
Yes. The City of Sacramento requires a permit for remodeling, and its remodel questionnaire sends structural changes to plan review before the permit is issued. We always apply for the permit ourselves.
The work you change is built to current code, and a permitted remodel also adds smoke alarms as in a new home. In a single-family home built on or before January 1, 1994, toilets over 1.6 gallons per flush, showerheads over 2.5 gallons per minute and indoor faucets over 2.2 gallons per minute are replaced before final approval.
We stop and show you. Mold work starts with fixing the water source. Suspected asbestos is tested first, and if it is asbestos, we work with a licensed abatement company before our work goes on. Both are priced in a written change order you sign first.
Yes. US Construction Remodeling can look at what was built, put the work on a permit, open what the inspector needs to see, fix what does not meet code and finish the job.
Anything unsafe: structural damage, active leaks, gas or electrical hazards and missing smoke or carbon monoxide alarms. Then the work inside walls you are opening anyway. Finishes can wait for a later phase.
Plan your project
Send your address, a few photos of the rooms and the walls you want gone. The visit is free, and we send a written price that names the structural work and the permit before any work starts.