Change of use
Planning approval first, then building plan review, then a new certificate of occupancy.
Type and hit enter
Commercial permits · Sacramento
In the City of Sacramento you need a new certificate of occupancy when your business changes how the space is used, and the change needs Planning approval before building plan review. The certificate itself is free and comes about a week after the final inspections; a move such as office to restaurant or salon also brings the Regional Sanitation sewer fee.
We always apply for the permit ourselves, starting with the City’s new tenant worksheet. Below: how the City sorts your space, what a change of use brings, the certificate and the business tax.

Planning approval first, then building plan review, then a new certificate of occupancy.
Free, about a week after the finals. A temporary one is $540.
No general business license: a Business Operations Tax certificate after a zoning check.
How the City sorts it
The City of Sacramento’s fee pages draw the line by whether anyone used the space before.

The first occupancy of a space nobody has used, usually in a new shell building.

A space another business used before, whether or not the use changes.

Your business uses the space differently from the last one, for example an office becoming a restaurant, a salon or a store.

The same kind of business with a new layout and finishes. Like every commercial remodel, it still goes to Planning before building plan review.
The first step
The City’s New Tenant Guidance Worksheet, form CDD-0458 revised November 6, 2025, starts it.
It goes to the City’s Planning staff, who say whether your use fits the zoning.
The prior use, any accessibility report, whether there is a kitchen or a water heater change, the fire sprinklers, and who is drawing the plans.
A food business also needs Sacramento County health approval, and the worksheet asks about it.
We fill in the worksheet with you and send it, then carry the answer into the plans and the permit.
What it brings
The City’s fee pages and forms list what follows a change of use.

A Planning referral before the building plans can go in.
When the new use sends more to the sewer, such as office to restaurant, salon, dry cleaner, brewery or deli, the Regional Sanitation fee is due.
A change to a more intensive use, such as office to retail, can bring impact fees.

A change of use may call for new fire protection systems. If the new use needs sprinkler changes, we include them in the same contract, with their own fire submittal.

The City’s exemption from stamped plans does not cover a change to a use with a higher life safety hazard, so those plans carry a licensed design professional’s stamp.

Altering the space can bring upgrades along the path into it. See our ADA compliance upgrades page.
The certificate
The City issues it only after the project is finaled.
Every final inspection passes first, and for a food business the County health final too.
Every permit fee is paid.
We send the City’s request form, CDD-0266.
The form says up to 5 working days and the City’s page up to 7 business days. The certificate is free.
A temporary certificate of occupancy for stocking, staff training or a partial opening costs $540 and needs a sign-off from every inspection discipline.
Business tax
The City of Sacramento handles it through a tax certificate.
The City does not issue one. Every business operating in the City needs a Business Operations Tax certificate instead.
After you apply, the City confirms the location is zoned for your business, then mails the certificate.
The tax is paid annually.
Our part
From the worksheet to the finals, US Construction Remodeling can handle each step with you. More on our permits and inspections, retail store and franchise build-out pages.
We look at the space and the worksheet questions with you, so you know the reviews before you sign.
We prepare the permit drawings, bring in a licensed design professional where the law calls for one, and apply for the permit ourselves.
We build the work, call the inspections and gather the finals the certificate needs.
About the author
Our Chief Designer wrote this guide.
Chief Designer
Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.
Sources
The City of Sacramento’s own pages and forms.
The first step for a new tenant: the use and zoning check.
What the City calls a tenant improvement.
Commercial remodels, Planning approval first, and the fees on a change of use.
When a certificate of occupancy is needed and how to request it.
Who may prepare plans, and the exemption’s limits.
The certificate of occupancy and temporary certificate fees.
The Business Operations Tax certificate.
California contractor license #1117562 on the state license board.
Practical questions
Short answers from the City’s pages.
When the use of the commercial space changes, yes. The City issues it after all the finals pass and the fees are paid.
Using a space differently from the last business, such as an office becoming a restaurant or a salon. In the City of Sacramento it needs Planning approval before building plan review.
The certificate is free. A temporary certificate for stocking, staff training or a partial opening is $540.
About a week after the finals: the request form says up to 5 working days and the City’s page up to 7 business days.
Only with a temporary certificate of occupancy, which needs a sign-off from every inspection discipline involved.
The City has no general business license. Each business needs a Business Operations Tax certificate, issued after a zoning check.
Plan your project
Send the address, the last use and what your business will do there. We tell you which approvals it needs and send a written price that names the permit.
US Construction Remodeling Corp. · CSLB #1117562 · 4424 Freeport Blvd. STE 4, Sacramento, CA 95822
Keep planning
Our build-out and permit pages, and the restaurant permit guide.