Brand requirements
Approved layouts, customer journey, finishes, millwork, lighting intent, signage, equipment, technology, accessibility standards, and required vendor packages.
We turn your brand prototype into a build plan for the actual space: lease conditions, landlord rules, utilities, permits, ordering, construction, inspections and turnover.
US Construction Remodeling Corp. works with franchisees, operators and property teams to settle these details before they cause delays on site. The prototype shows how the brand should look, and we check that the building can support it.

We compare the prototype with the lease, landlord rules, local requirements and the existing building, and list every place they do not match.
Approved layouts, customer journey, finishes, millwork, lighting intent, signage, equipment, technology, accessibility standards, and required vendor packages.
Measured dimensions, structure, slab and roof conditions, utilities, panels, HVAC capacity, plumbing routes, fire systems, accessible paths, and previous work.
Work letter, delivery condition, tenant allowance, base-building work, insurance, access, shutdowns, approved work hours, roof penetrations, and closeout rules.
Planning and use, Building, Fire, Health when applicable, signage, accessibility, energy documentation, trade permits, inspections, and occupancy conditions.

For a Sacramento-area restaurant franchise, we priced the floor replacement step by step instead of as one flooring line:
We settle these questions before work starts, so no decision holds up the schedule.
| Who | What they decide | What to keep |
|---|---|---|
| Franchisor or brand team | Prototype deviations, brand finishes, approved vendors, signage, equipment, technology, and final brand review | Current standards, written deviation approval, approved submittals |
| Franchisee or tenant | Business requirements, lease duties, budget decisions, selections, owner vendors, training, opening needs, and timely approvals | Decision log, signed scope, approved selections, owner-supplied list |
| Landlord or property team | Delivery condition, base-building scope, access, insurance, shutdowns, roof or riser access, utilities, inspections, and closeout | Work letter, landlord criteria, access and shutdown approvals |
| Architect and engineers | Site adaptation, code analysis, drawings, calculations, coordination between disciplines, and agency responses | Issued drawings, calculations, response log, approved revisions |
| Contractor and trades | Contracted scope, protection, means and methods, procurement, submittals, field coordination, testing, inspections, punch, and records | Proposal, schedule, submittals, field updates, inspection and closeout records |
We collect the lease, work letter, prototype, landlord rules, existing drawings, utility information, survey needs and opening constraints, then walk the site and note what we find.
We compare the prototype with the actual dimensions, structure, accessibility, utilities, equipment clearances, signage zones and building rules, and list each change the brand or landlord needs to approve.
We coordinate the architect and engineers, code review, trade drawings, landlord review, permit submittals, plan check comments and revisions.
We turn the drawings into measured quantities, allowances, alternates and exclusions, and plan owner vendors, long-lead items, submittals, order dates and substitutions.
We plan access, protection, deliveries, phasing, shutdowns, inspections, temporary conditions, work that must finish first, site safety and who gets which updates.
We sequence demolition, framing, mechanical, electrical and plumbing rough-in, fire and life safety work, inspections before walls and ceilings close, finishes, fixtures, equipment, signage connections, testing and corrections.
We close punch items, complete the required final inspections, hand over the agreed documents, show your staff the controls, clean the space and list anything still open with the owner, landlord, brand or city.
Each type of business has its own priorities. Not every item applies to every project.

Storefront, fixtures, lighting, stock and service areas, point-of-sale, security, accessibility, signage connections, deliveries, and durable finishes.

Food-facility plan review, equipment schedules, electrical loads, plumbing, grease and drainage, ventilation, fire suppression, washable finishes, service flow, and inspections.

Partitions, acoustic separation, customer areas, staff workflow, accessibility, lighting, power, data pathways, HVAC distribution, storage, and occupied-space phasing.
The City lists tenant improvements, commercial remodels, signs, and electrical, mechanical and plumbing work as permit types. A change of use can require Planning review before Building Plan Review. Food facilities built or remodeled in Sacramento County may also need Environmental Health plan review.
The 2025 California Building Standards Code is in effect from January 1, 2026 through December 31, 2028. We follow the code and agency rules for your address and filing date, not an old prototype note or another city’s approval.
A low total can leave out landlord work, design fees, permits, equipment connections, patching, testing or after-hours access. Check that each bid covers them.
Demolition, protection, partitions, ceilings, finishes, millwork, devices, fixtures, equipment connections, signage support, testing, cleanup, and punch work.
Brand products, approved equivalents, finish allowances, owner-supplied equipment, choices still open, upgrades and substitutions, each listed separately.
Who pays for design, engineering, surveys, testing, landlord reviews, permits, agency fees, special inspections, utility work and vendor coordination.
What was checked on site, what stays hidden until demolition, and how unexpected utilities, hazardous materials, slab, roof, structure or old work will be handled.
The decisions, approvals, long-lead items, shutdowns, earlier work, inspections, brand reviews, owner vendors and corrections that control the next step.
How changes are approved in writing with their cost and schedule impact, plus project updates, photos, decisions, RFIs, inspection status, punch items and closeout documents.

Chief Designer
Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.

General Contractor
Umit Sahin is a general contractor at US Construction Remodeling Corp. and oversees construction, permits, and inspections on our projects.
California contractor license #1117562 (B, General Building).
Short answers on scope, permits, schedule and bids.
A franchise build-out can include a site check, selective demolition, partitions, ceilings, finishes, millwork, signage connections, commercial kitchen or service equipment, plumbing, electrical, HVAC, fire and life safety work, accessibility upgrades, inspections, punch work and turnover documents. Your signed proposal lists the exact work.
Not always. The prototype shows how the brand should look, but every site has different dimensions, utilities, structure, accessibility conditions, landlord rules, local approvals and existing work. We list the differences so the brand team, landlord and city can approve them before construction starts.
Many commercial remodels and tenant improvements need permits or agency review. The path depends on the address, the existing and new use, the construction work, signage, food service, accessibility, fire and life safety systems, and any electrical, mechanical or plumbing work. We confirm the current requirements before demolition or ordering.
The contract names who handles brand approvals, lease and landlord approvals, drawings and engineering, permit responses, product selections, owner vendors, construction, inspections and turnover. We run the construction and coordinate the handoffs between these parties. The architect, engineers, brand team and landlord make their own approvals.
It depends on the project. The site check, landlord approval, design decisions, agency review, long-lead products, utility capacity, equipment, shutdowns, inspections, hidden conditions and owner decisions all affect the schedule. Our schedule shows those dependencies and the dates when decisions are needed.
Sometimes, if the work and the site allow safe phasing. The plan covers work zones, customer and employee routes, dust and noise control, utility shutdown windows, fire and life safety systems, deliveries, daily cleanup, inspections and handing back each area when it is finished.
Compare more than the total: the measured work, demolition, protection, mechanical, electrical and plumbing work, finish and equipment allowances, signage connections, who pays for permits and design services, landlord work, owner-supplied items, access and after-hours work, testing, patching, cleanup, schedule dependencies, exclusions and how changes are approved in writing.
No. It shows how one Sacramento-area restaurant franchise estimate broke out flooring removal, substrate preparation, commercial sheet vinyl, heat-welded seams, transitions and disposal. Your price depends on your site and brand standards.
Send the address, concept, current drawings, the work you need, landlord rules, known equipment, approval status and opening constraints. We call you to set up a free visit to look and measure. We are open every day, 9 AM to 5 PM.