Restaurant build-outs · Sacramento
We prepare the permit drawings and apply for the City and County permits ourselves; where the law calls for a licensed design professional’s stamp, we bring one in under our contract. Sacramento County has 20 working days to review the health plans, and the City lists 15 working days for a first building review of an alteration under $400,000.
Below: the order of approvals, who may draw what, review times, sample fees, and how US Construction Remodeling can help.

We prepare them. A licensed design professional stamps the restaurant plans, under our contract.
We apply for the City and County permits ourselves and answer the review comments.
County health review: 20 working days. City building review: 15 working days for a first review under $400,000.
The order
For a restaurant inside the City of Sacramento. The building application needs both the County submittal and Planning approval, which can run side by side.

Before the lease we look at the drains, the gas, the electrical service, the restrooms and the hood route.

The County reviews the kitchen from the equipment list, so it comes first. A change after submittal means revised plans.

The plans go to Sacramento County’s Environmental Management Department. The City asks for proof of that submittal with the building application.

Planning approval comes before the building application.

The approved health plans, and the sewer fee receipt when the use sends more to the sewer, come before the City issues the permit.

City inspectors see the work before it is covered.

The City’s final inspection, a new certificate of occupancy when the use changed, and the County’s final inspection and health permit come before you serve the first customer. Read change of use and certificate of occupancy.
The drawings
The City of Sacramento’s form CDD-0236, revised January 1, 2026, sets the rule.
Building plans are prepared and signed by a licensed design professional, unless the work fits the City’s narrow exemption.
The City’s exemption covers only simple office or store interiors with one exit and no change to structure or fire safety, so restaurant plans usually carry a stamp.
The City’s submittal checklist asks for the signed stamp on the cover sheet and on every sheet.
We prepare the permit drawings and run the design team, so the plans, the equipment list and the County set describe the same kitchen.

How long
Published review times, for complete submittals.
State law gives Sacramento County 20 working days to approve or reject complete plans.
The City lists 15 working days for the first review of a commercial alteration under $400,000, then 10 for each of the next two.
It covers office and store interiors of 3,000 sq ft or less in 1-3 business days. It leaves out first tenant improvements, changes of occupancy, and County health projects sent without the County receipt.
Outside city limits, Sacramento County takes about 1-3 days to log the plans, then 14-21 working days to review them.
Roseville lists about 3 weeks for a first review. A simple tenant improvement may be reviewed within one business day.
Metro Fire, which covers most of the unincorporated county, takes about 20 business days. The kitchen hood’s fire suppression system is its own fire submittal.
What it costs
The City of Sacramento sets building fees from the job’s value: its valuation table or the contract price, whichever is higher. Sample rows from form CDD-0216, revised July 12, 2026.
Building permit $475, plan review $373.
Building permit $704, plan review $561.
Building permit $1,078, plan review $866.
A 10% technology fee on the permit and plan review, a General Plan fee of $2.60 per $1,000 of value, and smaller state fees.
City fire plan review is $260 an hour, and the fire inspection for a remodel is 8 cents a square foot, at least $294.
When the new use sends more to the sewer, as when an office becomes a restaurant, the Regional Sanitation fee is due before the permit.
The County plan check fee for 2026-27 follows the size of the remodel. Our health plan review guide lists it.
How we can help
From the first look at the space to the final inspection, US Construction Remodeling can handle each step with you.
We walk the space with you and list the reviews it will need, so there are no surprises after the lease.
We prepare the permit drawings, and where the plans need a licensed design professional’s stamp, we bring one in under our contract.
We apply for the City and County permits ourselves and answer the review comments sheet by sheet.
We build the work and call the inspections, so nothing is covered before the inspector has seen it.
Have a space in mind? Send the address and the menu, and we will tell you which reviews it needs.
Get my free estimateRestaurant build-outsAbout the author
Our Chief Designer wrote this guide.
Chief Designer
Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.
Sources
The City, County and fire district pages behind these steps.
Who may prepare plans, and the narrow exemption.
The submittal checklist: Planning approval first, stamps on every sheet.
Small Project Rapid Review and what it leaves out.
City plan review cycle times.
City commercial permit fees by job value.
Commercial remodels and the sewer fee on a change of use.
Sacramento County food facility plan review.
Review times in the unincorporated county.
Roseville review times and the simple tenant improvement path.
Metro Fire plan submittals, review times and the separate hood system submittal.
Metro Fire fees, including $1,327 per hood suppression system.
California contractor license #1117562 on the state license board.
Practical questions
Short answers from the City and the County.
We prepare the permit drawings. Restaurant plans in the City of Sacramento usually carry a licensed design professional’s stamp, and we bring one in under our contract.
We always apply for the permit ourselves, with the City and the County, and we answer the review comments.
Yes. The City asks for proof of the County submittal with the building application, and the approved health plans before it issues the permit.
The County has 20 working days for complete health plans, and the City lists 15 working days for a first building review of an alteration under $400,000. Each resubmittal adds a review.
For a $49,999 job the City lists a $704 permit and $561 plan review, plus a 10% technology fee and smaller state fees.
Yes. The hood’s fire suppression system is a separate fire submittal with its own fee. Inside the City, fire plan review is $260 an hour; in Metro Fire’s area it is $1,327 per system.
Plan your project
Send the address, the menu and the equipment list. We look at the space for free and send a written price that names the drawings, the permits and the build.