Interior refresh · Sacramento

Interior Refresh in Sacramento: New Floors Through the Kitchen, Paint, Lighting and Trim

Plan an interior refresh in one order: wiring and light boxes, then walls and paint, then one new floor through the kitchen and first floor, then doors and trim, and light fixtures last. US Construction Remodeling can design, price and build all of it under one contract, with good, better and best options priced side by side.

Below: the order of work, one floor through the kitchen and first floor, paint, lighting, trim, good, better and best choices, and the Sacramento rules that touch each one.

A hallway opening into a kitchen, with one wood-look plank floor running through, white doors and a marble-look waterfall island
One floor from the hallway into the kitchen, with new doors, trim and paint around it.

One order of work

Wiring, walls and paint, the floor, trim, then light fixtures, so later work does not damage finished work.

One floor, fewer seams

One floor through the kitchen and the first floor reads as one space, with fewer thresholds.

Good, better, best

Each step up priced on its own line, so you spend where it lasts and save where a change is easy.

Start here

Where does an interior refresh start?

With a room-by-room list and one order of work. Finishes go in from the top down, so later work does not damage finished work.

Walk the house first

List each room and what changes or stays: floors, paint colors, light fixtures, doors and trim. Measure the floor area early, since the floor is usually the largest order. Our flooring calculator gives a first estimate of the material.

The order of work

New wiring and light boxes go in first, then drywall repairs, primer and paint. The new floor follows, then doors and door casing, then baseboard and the last coat of paint on the trim. Light fixtures, switches and cover plates go on last, after the paint.

What needs a permit

The City of Sacramento lists painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work as work that needs no building permit, except in a design review or historic preservation district or on a historic landmark. Related work may need one, such as moving electrical fixtures for new cabinets or counters, and electrical work and ceiling fans need one. Sacramento County and other cities keep their own lists.

Smoke and carbon monoxide alarms

On permitted work, the City’s code sheet says interior alterations worth more than $1,000 need smoke alarms as required for new homes, such as in each bedroom, outside the sleeping areas and on every floor. They may be battery operated. A carbon monoxide alarm goes in where the home has a fuel-burning appliance, such as a gas furnace or fireplace, or an attached garage.

Living at home during the work

Rooms can be done in stages so part of the house stays usable. Our guide to living through a remodel covers stages, a temporary kitchen and a closed-off work area.

One floor through

How do you run one new floor through the kitchen and first floor?

Plan the floor with the kitchen, not after it: the floor type decides whether the cabinets go in first and how the rooms meet.

Drawing of an open first floor where one wood-look plank floor runs from the kitchen through the dining and living areas with no thresholds

One floor, fewer seams

One floor from the entry through the kitchen, dining and living areas reads as one space and leaves fewer thresholds. It goes in during one stretch of the work, before the baseboard goes back.

Cabinets and the floor

A floating floor, such as most vinyl plank and laminate, is laid around cabinets and islands, not under them, so it can move. A glued or nailed floor can run under the cabinets. Run the new floor into the dishwasher space, or raise the cabinets to match, so the dishwasher fits under the counter and can come out for service.

A flat floor underneath

Old flooring often leaves high and low spots. A 2013 Tile magazine article on the Tile Council of North America site explains that the TCNA Handbook allows 1/8 inch of variation in 10 feet under larger tiles and 1/4 inch under smaller ones. Vinyl plank and laminate set their own limits in their installation guides. High spots are ground down and low spots filled before the new floor goes down.

Wood floors and trim

The US Forest Service Wood Handbook says to install wood at the moisture content it will have in use, to avoid problems such as floor buckling. So wood flooring and trim are brought inside to adjust with the heating or air conditioning running, for the time the maker’s guide sets, and checked with a moisture meter against the subfloor. On a concrete slab, engineered wood is the usual choice.

Where floors meet

A threshold or reducer joins the new floor to tile, carpet or a sliding door track, and stair nosing matches the new floor at the steps. A floating floor also needs a small gap at the walls, which the baseboard covers, and some need a break in long runs or at doorways, as the product’s installation guide says.

Wet rooms

Bathrooms and laundry rooms need a floor made for water, such as porcelain tile, or a vinyl plank its maker rates waterproof, sealed at the tub and toilet as its guide says. More in our bathroom flooring guide.

Older floors

Old sheet vinyl and floor tiles may contain asbestos. Test before removal: if a test finds asbestos, we work with a licensed abatement company before the new floor goes in. Sometimes the new floor can go over the old one, so nothing is disturbed. More in our older home guide.

Paint

How do you choose paint for a whole-house refresh?

Pick the sheen by room, plan the prep, and choose the colors for the rooms that connect.

Sheen by room

Flat paint on ceilings hides small flaws. Eggshell or satin on walls wipes clean, and semi-gloss on trim, doors and cabinets stands up to hands and mops. Shinier finishes show patches and texture, so patched walls often look best in eggshell.

Drawing of a wall prepared for paint, with patched spots, taped trim, a sanding sponge, a drop cloth, a roller and a paint tray

Prep comes first

Most of a good paint job is prep: patching holes and cracks, sanding, caulking trim joints and priming patches and stains. New drywall gets a primer before any color.

Paint and air rules

Rule 442 of the Sacramento Metropolitan Air Quality Management District caps volatile organic compounds in paint used there: today 50 grams per liter in flat paint, 100 in nonflat and 150 in high gloss. The rule sorts paint by a gloss meter reading, and satin and semi-gloss usually count as nonflat. Fresh paint still smells while it cures, so keep the rooms aired out.

Colors across rooms

One wall color through connected rooms, with the trim in one white, keeps an open first floor calm; save stronger color for one room or wall. Our paint calculator estimates the paint by room.

Textured walls

Patches in textured walls or ceilings are matched to the old texture before paint, so they do not show.

Lighting

What lighting rules apply when you change fixtures?

In California, the lights you change must meet the 2025 Energy Code. The lights you leave alone can stay.

Only what you change

The 2025 Energy Code says altered lighting must meet the home lighting rules in Section 150.0(k). Existing recessed cans with screw sockets can stay if they get trim kits or lamps marked JA8, California’s standard for high-efficiency light sources. More in our energy-efficient remodel guide.

Fixtures and lamps

New fixtures and lamps must meet Joint Appendix JA8 and carry its mark, so look for JA8 on the box. A few are exempt, such as lights built into range hoods, exhaust fans, vanity mirrors and ceiling fan kits, and night lights under 5 watts.

Recessed lights

New recessed ceiling lights have no screw-in sockets. Where the ceiling is insulated, each one carries a label showing it is airtight, with less than 2.0 cubic feet per minute of air leakage in a standard test. It is sealed to the ceiling with a gasket or caulk, or installed as the maker’s instructions say.

Dimmers and sensors

Lights in living spaces, such as living rooms, dining rooms, kitchens and bedrooms, get wall dimmers, with a few exceptions such as night lights. In bathrooms, laundry rooms, garages, utility rooms and walk-in closets, at least one light turns off on its own with an occupancy or vacancy sensor.

Drawing of a kitchen lit by recessed ceiling lights, pendants over the island, a strip of light under the wall cabinets and a soft accent glow along the toe-kick

Layers of light

Plan ceiling light, task light under the cabinets and over the island, and accent light. Under-cabinet lights switch separately from the ceiling lights, as the code requires. More ideas in our kitchen lighting guide.

A switch in every room

On permitted electrical work, the City’s code sheet asks for at least one wall-switched light in every habitable room, bathroom, hallway and stairway.

Trim and doors

How do you choose trim and doors that last?

Choose the material for the room, the profile for the house, and put the trim on after the floor.

Drawing of a room corner where a painted baseboard and a small shoe molding sit on a wood-look plank floor

Baseboard and shoe molding

Baseboard goes on after the floor and covers the gap at its edge. A small shoe molding along the bottom covers what an uneven floor leaves. Both are nailed to the wall or the baseboard, not through a floating floor, so the floor can still move.

Paint-grade materials

MDF trim is smooth and costs less but swells if it stays wet. Finger-jointed pine or solid poplar holds nails and handles a splash better than MDF; poplar is the harder of the two. Bathrooms and entries can use moisture-resistant trim such as PVC.

Stain-grade wood

Solid oak or another hardwood is chosen to go with the floor or the doors, and the stain is tested on a scrap first.

Profiles that fit the house

Older bungalows often have tall, flat boards with a small cap, mid-century ranches short, simple ones, and many newer homes shaped profiles. Matching what the house has looks most natural. Our remodel design style guide covers matching the trim you keep.

Interior doors

Doors are chosen with the trim: panel style, height and thickness. Solid-core doors feel heavier and block more sound than hollow-core ones.

Good, better, best

What do good, better and best look like for each finish?

Price usually rises from good to best; durability does not always. Spend where a choice is hard to change and save where it is easy.

Drawing of three floor samples side by side: a vinyl plank with a click edge, a wood-look porcelain tile and a solid hardwood board

Floors

Good: laminate, or vinyl plank with a thinner wear layer. Better: vinyl plank with a thicker wear layer, or porcelain tile. Best: engineered or solid hardwood, or large porcelain tile.

Paint

Good: walls patched, primed and given two coats of a standard paint. Better: walls and ceilings in a scrubbable paint. Best: walls, ceilings, trim and doors, with an enamel on the trim.

Lighting

Good: new JA8 fixtures in the existing boxes, with dimmers. Better: added recessed lights and under-cabinet lights. Best: layered light with more switch locations and dimming scenes.

Trim and doors

Good: painted MDF baseboard and casing. Better: finger-jointed pine or poplar in a taller profile. Best: solid wood trim and solid-core doors.

How we price them

We can price the options side by side on the same estimate, each on its own line, so you see what each step up adds. More on how our estimates work.

Where to spend

Spend on what is costly to redo: the floor, the wiring and the lighting layout. Save on what is easy to change later: paint colors, fixture styles and hardware.

How we help

How can US Construction Remodeling help with an interior refresh?

US Construction Remodeling can take the whole refresh from the first walk-through to the final inspection, under one contract.

A free first meeting

We walk the house with you, list what changes and what stays, and measure the rooms. The design and the written estimate are free, with no commitment.

See it first

Our free 3D design shows the floor, colors and lighting in your own rooms before you buy anything.

One project manager

One project manager plans the order of work, so you do not coordinate the trades yourself.

Permits and inspections

We always apply for the permit ourselves when the work needs one, and schedule each inspection through the final.

Your own materials

You can also supply your own flooring, tile, fixtures or other materials, and we install them. Check the quantities with us before you buy: flooring and tile need extra for cuts, and our flooring calculator adds 10 percent.

Planning the kitchen too? Our kitchen timeline and whole-home cost guides go deeper.

Kitchen remodeling timelineWhole-home cost and timelineGet my free estimate

About the author

Who wrote this guide?

Our Chief Designer wrote this guide.

Written by Emin

Chief Designer

Emin is the Chief Designer at US Construction Remodeling Corp. Emin leads client design meetings, measured layouts and 3D visualization in Revit, 3ds Max and Unreal Engine, and uses AI tools to speed up design and project planning.

Sources

Where can you check these rules?

The City of Sacramento, the California Energy Commission, the Sacramento air district, the Tile Council of North America, the US Forest Service and the US EPA.

City of Sacramento: required building permits

Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work need no building permit outside design review and historic preservation districts; electrical work and ceiling fans need one, and related work may.

Practical questions

What else do homeowners ask?

Short answers about floors, cabinets, paint, lighting, permits and pricing options.

Can one contractor handle a kitchen remodel and new flooring through the first floor?

Yes. US Construction Remodeling can remodel the kitchen and lay one new floor through the first floor under one contract, so the floor, cabinets, appliances and trim are planned together.

Will you price good, better and best options for materials and finishes?

Yes. We can price the options side by side on the same estimate, each on its own line, so you see what each step up changes in the price.

Can I supply my own materials?

Yes. You can buy your own flooring, tile, fixtures or other materials, and we install them. Check the quantities with us before you order, so there is enough for cuts and everything arrives before that stage of the work.

In what order should an interior refresh go?

New wiring and light boxes, drywall repairs, primer and paint, the new floor, doors and casing, then baseboard and the final coat of paint on the trim. Light fixtures, switches and cover plates go on last. The floor goes in before the baseboard, so the baseboard covers its edge.

Does painting or new flooring need a permit in Sacramento?

Usually not. The City of Sacramento lists painting, tiling, carpeting, cabinets, counter tops and similar finish work among the work that needs no building permit, outside design review and historic preservation districts. Electrical work and ceiling fans need one, and moving electrical fixtures for new cabinets may too.

Do new light fixtures have to meet the current code?

The ones you change do. The 2025 Energy Code says altered lighting must meet today’s home lighting rules, such as JA8-marked fixtures and wall dimmers in living spaces. Lights you leave alone can stay.

Should the cabinets go in before or after the new floor?

It depends on the floor. A floating floor, such as most vinyl plank and laminate, goes around the cabinets, so they go in first; a glued or nailed floor can run under them. Run the new floor into the dishwasher space, or raise the cabinets to match, so the dishwasher fits and can come out for service.

Which paint sheen goes where?

Flat on ceilings hides flaws; eggshell or satin on walls and semi-gloss on trim and doors wipe clean more easily. Shinier finishes show patches, so patched walls often look best in eggshell.

Is there a fee for the design and the estimate?

No. The first meeting, the design and the written estimate are free, with no commitment.

Plan your project

Planning new floors, paint, lighting or trim?

Send your address, a few photos and the rooms you want to refresh. The first meeting is free, and we send a written price, line by line.

US Construction Remodeling Corp. · CSLB #1117562 · 4424 Freeport Blvd. STE 4, Sacramento, CA 95822